精品一区二区三区中文,极品风骚人妻3p视频,成人激情在线导航,色噜噜综合在线视频

網(wǎng)站公告-NOTICE
航豐實(shí)業(yè)·產(chǎn)品分類
聯(lián)系我們
濟(jì)南航豐實(shí)業(yè)有限公司

電話:15168870138
聯(lián)系人:龐經(jīng)理

網(wǎng)址:http://66343.cn  

廠址: 德州市禹城市莒鎮(zhèn)產(chǎn)業(yè)園26棟

經(jīng)銷商地址:天橋區(qū)建華五金市場(chǎng)東區(qū)5-1  

魯ICP備09095923號(hào)-1

新聞資訊

當(dāng)前位置:首頁(yè) / 新聞資訊

濟(jì)南電纜橋架: 橋架間距應(yīng)該如何設(shè)置?

  電纜橋架水平安裝時(shí),支吊架之間距離適合在1.5米~2米,在轉(zhuǎn)彎處的支吊架間距應(yīng)為0.3米~0.6米,垂直安裝電纜橋架時(shí),支吊架間的距離不應(yīng)該超過(guò)2米。下面由濟(jì)南航豐實(shí)業(yè)的小編給大家介紹一下安裝電纜橋架間距要求的相關(guān)內(nèi)容。

When installing cable trays horizontally, the distance between supports and hangers should be suitable between 1.5 to 2 meters. The distance between supports and hangers at turns should be between 0.3 to 0.6 meters. When installing cable trays vertically, the distance between supports and hangers should not exceed 2 meters. Below, the editor from Jinan Hangfeng Industry will introduce the relevant content on the spacing requirements for installing cable trays.

  電纜橋架與一般工藝管道平行鋪設(shè)時(shí),敷設(shè)間隔少400毫米,與工藝管道交叉敷設(shè)時(shí),安裝間距小為300毫米,電纜橋架與腐蝕氣體管道的平行間距少為500毫米,交叉間距小為500毫米。電纜橋架水平安裝時(shí),應(yīng)該按照載荷規(guī)范選擇支、吊架間距,距離不應(yīng)該大于2米。電纜橋架支、吊架的間距也要參考其產(chǎn)品性能參數(shù)說(shuō)明來(lái)設(shè)置。

When the cable tray is laid parallel to the general process pipeline, the laying interval should be at least 400 millimeters. When cross laid with the process pipeline, the installation interval should be at least 300 millimeters. The parallel spacing between the cable tray and the corrosive gas pipeline should be at least 500 millimeters, and the cross spacing should be at least 500 millimeters. When installing cable trays horizontally, the spacing between supports and hangers should be selected according to the load specifications, and the optimal distance should not exceed 2 meters. The spacing between cable tray supports and hangers should also be set according to the product performance parameter specifications.

20210330042649173.png

  單層電纜橋架安裝時(shí),配套支吊架的間距不應(yīng)該大于2米,電纜橋架多層同時(shí)敷設(shè)時(shí),支吊架之間的距離應(yīng)該根據(jù)載荷進(jìn)行具體計(jì)算。電纜橋架與無(wú)保溫的熱力管道水平敷設(shè)時(shí),平行間距少為1米,交叉鋪設(shè)時(shí)的小間距應(yīng)為0.5米,電纜橋架與有保溫措施的熱力管道交叉敷設(shè)時(shí)距離小為300毫米,水平鋪設(shè)時(shí)距離少為500毫米。

When installing single-layer cable trays, the spacing between supporting brackets should not exceed 2 meters. When laying multiple layers of cable trays simultaneously, the distance between brackets should be calculated specifically based on the load. When cable trays are horizontally laid with uninsulated thermal pipelines, the parallel spacing should be at least 1 meter, and the minimum spacing when cross laid should be 0.5 meters. When cable trays are cross laid with insulated thermal pipelines, the minimum distance is 300 millimeters, and when horizontally laid, the distance is at least 500 millimeters.

  本文由 濟(jì)南電纜橋架 友情奉獻(xiàn)。更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊: http://66343.cn 真誠(chéng)的態(tài)度,為您提供為的服務(wù)。更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn),敬請(qǐng)期待。

This article is dedicated to the friendship of Jinan cable tray. For more information, please click on: http://66343.cn Sincere attitude, providing you with comprehensive service. We will gradually contribute more relevant knowledge to everyone, please stay tuned.

 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
中文字幕人妻偷人伦在线视频| 一区二区三区偷拍精品| 2021国产精品久久久久| 好看日韩一区二区三区| 亚洲高清无码在线| 丁香五月玖玖婷婷| 欧美亚洲天堂| 天天爽夜夜爽夜夜爽精品| 国产六月婷婷爱在线视频| 美女张张双腿男人的桶| 日韩性无码国产精品专区| 人妻蜜1–4中文| 亚洲第一激情小说| 久久99国产综合精品无码| 99国产欧美一区| 69精品人人| 少妇熟女一区| 精品无码一区在线观看| 后入欧美99| 18免费人成国产网页在线观看| 日韩精品综合一区二区| 美国日韩AⅤ片免费| 北岛玲人妻味道丰满人妻| 国产99视频精品免费| 女人av一区| 欧美99欧美久久| 国产成人综合在线观看| 丁香五月主页| 超碰碰97| 亚洲青青草一区| 欧美熟妇另类久久久久久不卡| 亚洲东京热无码素人久久久| 日韩熟妇XXXX| 人妻中出受孕中文字幕在线| 日韩精品福利| 99精品人妻无码专区在线视频区 | 精品国家WWW| 亚洲精品无码av人在线观看国产| 久久20| 午夜熟女插插XX免费视频| 精品人妻一乃葵AV中出|