精品一区二区三区中文,极品风骚人妻3p视频,成人激情在线导航,色噜噜综合在线视频

網(wǎng)站公告-NOTICE
航豐實(shí)業(yè)·產(chǎn)品分類
聯(lián)系我們
濟(jì)南航豐實(shí)業(yè)有限公司

電話:15168870138
聯(lián)系人:龐經(jīng)理

網(wǎng)址:http://66343.cn  

廠址: 德州市禹城市莒鎮(zhèn)產(chǎn)業(yè)園26棟

經(jīng)銷商地址:天橋區(qū)建華五金市場東區(qū)5-1  

魯ICP備09095923號(hào)-1

新聞資訊

當(dāng)前位置:首頁 / 新聞資訊

鋁合金封閉母線槽安裝對支架間距的要求

  1.組合式鋁合金封閉母線槽安裝技術(shù)要求較高,對建筑結(jié)構(gòu)上的預(yù)埋件質(zhì)量、支撐結(jié) 構(gòu)的強(qiáng)度、安裝精度要求也較高。為了保證安裝質(zhì)量,好在施工現(xiàn)場用經(jīng)緯儀在各個(gè)預(yù)埋件 上找出統(tǒng)一高度,做好標(biāo)記,可以有效減小水平安裝誤差。
  1. combined Aluminum Alloy closed busbar installation technical requirements for high building structure of embedded parts quality, supporting structure strength and installation precision is higher. In order to ensure the quality of the installation, the best at the construction site with a theodolite in various embedded parts out of uniform height, mark, can effectively reduce the level of installation error.
  組合式鋁合金封閉母線槽水平安裝 時(shí),插接箱與組合式鋁合金封閉母線槽是結(jié)合為一體的,其安裝位置較高,不便于日后的操作 和維護(hù)。
  Combined Aluminum Alloy closed busbar horizontal installation, connection box and combined Aluminum Alloy closed busbar is integrated, the installation of a higher position for days after operation and maintenance.
  2.封閉式母線槽安裝時(shí)整體結(jié)構(gòu)應(yīng)橫平豎直,母線通道水平安裝,兩支架間距≯2500㎜, 垂直安裝間距≯3600㎜;水平安裝時(shí)距地面安裝高度不小于2.2m,吊桿應(yīng)有調(diào)節(jié)水平的技術(shù)措施。
濟(jì)南電纜橋架廠家
  2. Enclosed Busbar installation structure should be horizontal and vertical, horizontal channel bus installation, two support spacing more than 2500 mm, 3600 mm spacing using vertical installation; when installed horizontally from the ground installation height of not less than 2.2M, technical measures must be taken to adjust the level of the boom.
  3.母線垂直通過頂板敷設(shè)時(shí),應(yīng)在通過的底板上采用槽 鋼支撐固定,當(dāng)封閉式母線跨越建筑物的伸縮縫或沉降縫時(shí),采用適應(yīng)建筑物結(jié)構(gòu)移動(dòng)的措施, 防止母線連接處水平移動(dòng)造成斷裂,影響母線的 供配電。
  3. bus through vertical roof laying, the floor should be in by using fixed channel support, when the telescopic enclosed bus across the building seam or settlement joint, using adaptive structure mobile measures, prevent the busbar connection level caused by movement of fracture, influence of bus power supply.
  4.垂直敷設(shè)時(shí)距地面1.8m以上,安裝支架應(yīng)與通道側(cè)板配鉆孔,采用M6-M8螺栓緊固。母線的 拐彎處以及與插接箱的連接處應(yīng)加支架。 支架成排安裝時(shí)支架成排安裝時(shí)應(yīng)排列整齊間距均勻。
  4. the vertical laying is more than 1.8m from the ground. The mounting bracket should be drilled with the channel side plate and fastened with the M6-M8 bolt. The bends of the busbar and the connection to the socket should be added. When the bracket is installed and installed, the bracket should be arranged in uniform spacing when the bracket is installed and installed.
  當(dāng)母線的終端盒、始端盒懸空時(shí)應(yīng)采用支架固定,墻體、頂板上的支架必須用兩條膨脹螺栓固 定,膨脹螺栓應(yīng)加平光墊片和彈簧墊片。
  When the bus terminal box, the box should be used when the end hanging bracket, bracket wall, roof must use two expansion bolt, expansion bolts should be flat and spring washers.
  我們用滿腔的熱情、無限的激情對待工作和客戶,濟(jì)南電纜橋架愿意用勤奮的努力和您一起共鑄美好明天!
  We are filled with enthusiasm and passion towards work and customer, Ji'nan cable tray willing to hard work and you create a better tomorrow!
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
色在线播放| 中文字幕欧美激情区| 日韩av中文在线播放| 欧美人成国产91视频| 阳江市| 日韩中文字幕丝袜在线第一页| 日本欧美三级r级国产在线| 久久国产乱子伦免费精品视频| 亚洲欧洲日产国码v不卡| 激情欧美亚洲一区二区| 天天干夜夜爽国语对白| 神马久久www| 日韩久久久久久中文人妻| 久久久久久都是精品免费| 婷婷五月丁香欧美| 欧洲精品一区二区三区在线观看| 日韩一区二区最新无码| 少妇1区2区3区| 日韩AV不卡一区二区三区无码| 四虎影视观看| 精品免费视频二区| 无码精品一区二区三区免费视频| 久久久久亚洲AV无码AV男人| 少妇高潮-区二区三区99| 亚洲精品二久久久久久久| 免费国产中文字幕| 亚州a免费视频| 日本成人大片免费| 中文字幕日韩精品有码视频 | 五月婷婷久久亚洲| 天色天干天色东京热| 丰满的少妇二区三区| 亚洲色性视频在线| 女女女女女女BBBBBB毛| 欧美日韩激情精品一区| 99久久精品费精品| 一区二区99| 999热久久久精品国产| 国产AⅤ无码片毛片一级一区2| 天堂有码无码| 欧美官网免费播放三区|